JFB bridge as railway station platform access

As a part of revitalization of a railroad in Cieszyn, Poland, new station Cieszyn - University was planned by the Polish Railways (PLK PLK). To access its platform from Kazimierza Brodzińskiego street, a pedestrian bridge was needed due to environment protection requirements. JFB access bridge was selected by the general contractor and delivered within 3 months from order. It includes specific features corresponding PKP PLK requirements, such as leading path.

Condividi:

Dettagli del progetto

Soluzione
Fiber Reinforced Bridges
Tipo
JFB
Lunghezza
9m
Larghezza
2m
Peso
3000 kg
Carico di traffico ammissibile
Eurocode LM4
Materiale ponte
Fibre-reinforced polymere
Finitura impalcato
Epoxy resin, anti-slip
Fiber Reinforced Bridges